Synchronizing Linked Views

Synchronizing linked Data

Synchronizing linked views

Holes or intervals selected in one view can be displayed in any other view using hePlot Viewribbon (Plotswindow active) |View | Synchronizecommand from the menu. The action of other views when a selection is synchronized is determined by the status of the Linked and Live settings

When view is

Synchronizing a selection in another view will

Linked only

Select and display the same selection. The data selected will not always be visible.

Linked and Live

Select and display the same selection and modify the view so that the selected data is visible.

Live only

Modify the view so that the selected data is visible but not selected.

You can synchronize views in many ways

Choose the method which best suits the way you work:

  • ThePlot Viewribbon (Plotswindow active) |View | Synchronizecommand, or
  • Select a hole interval then right-click to display the context menu. Select Synchronize.

 

note.gif (1017 bytes)

The view in which the data was originally selected does not need to be Linked or Live to permit synchronizing other views.
Data can be selected in any table, section, 3D or log view and synchronized with all other linked table, section, 3D and log views.

 

  openbook.gif (910 bytes)   Related Topics

 

Selecting Samples
Compositor Tool